Ten checks on the plan, one afternoon, and the order can go out. Skipping them is how a room gets built twice.
Covers per square metre, aisle widths, sightline from the door, accessible cover and turning circle, banquette lengths against walls, table sizes on the grid, seat heights, service route to the pass, buffet queue, and storage for chairs.
Each takes ten minutes on the plan and each has cost a project a week when missed.
Designer, operator, housekeeping and the furniture supplier. Four people, one plan, two hours.
The operator finds the service problems, housekeeping finds the cleaning problems, and the supplier finds the ones that cannot be built.
The dated layout with the ten checks marked as done, and a furniture schedule that matches it. That document is the reference for the order, the install and the snag list.
Then any change after signing is a variation, not a conversation.
Seat heights at 450–470 mm, tables at 750 mm, and the schedule in chair schedule that suppliers can price.
The whole room sequence sits in the design guide.