







Solid wood and plywood are cut, drilled and dowelled on jigs held to ±2 mm, so leg length repeats from the drawing rather than from the operator.
Steel tube is cut, welded and squared in a fixture, then goes through four-stage pre-treatment and powder coat. The batch is recorded against the order.
Foam is cut and moulded in-house, and covers are cut from the roll recorded on the order. Corners are folded by hand, which is why a re-cover matches the first run.
Cartons are marked to the floor or room block on the drawing, with a packing list per block. Stack pitch is set by the frame jig, so a full stack sits level.
Seat height, top size, cover and finish set from your floor plan. Hotel projects and room-block deliveries.
The message is already started. Add the dates that suit you and send it.
WhatsApp and phone
+86 188 7070 7780
Reply within one working day, Foshan time.