Qinghe.
EN
Home / Blog / Factory / 24 Nov 2026

How a Chair Quotation Is Built

Material, labour, overhead, packing, margin. Five lines, and only one of them is worth arguing about.

Part of the factory guide — Inside a Chair Workshop in Lecong

The five lines

Frame 35–45% of FOB of FOB, upholstery 20–30%, finish 10–15%, packing 3–4%, and the rest is labour, overhead and margin.

So a 10% discount is either a margin cut, a material substitution, or a specification change. There is no fourth option.

What moves the price

Species, cover, and quantity. Then finish: a three-coat finish and a two-coat finish differ by 4%. Tooling on a new model adds a fixed cost that a small order cannot absorb.

6 pcs per line is the line minimum. Below it, setup cost per chair rises sharply.

Why two quotes differ by 30%

Different species, different cover, different joint, or a different labour assumption. Rarely margin alone.

So compare line by line and ask what was assumed for each. The quote that cannot be broken down is a quote that cannot be compared.

What a good quotation contains

Model reference, species by part, cover reference, finish reference, quantity, unit price, packing, Incoterm, lead time and payment terms. Nine items on one page.

Comparison method sits in comparing two quotes, and cost structure in the factory guide.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →