Inside a Chair Workshop in Lecong

Our workshop sits in Lecong, Shunde, Foshan, has run since 2011, and builds 833 models on one drawing standard. about 120 in the workshop, 9 in the sample room.

This guide is what a buyer should see on a visit, and what can be checked from a desk 8,000 km away when a visit is not possible.

The five lines

Timber machining, metal shop, upholstery, finishing, packing. Every frame goes through all five in sequence, and the handover between them is where defects get created and where they get caught.

Timber arrives rough and leaves as a cut part. Metal arrives as tube and leaves as a coated frame. Nothing crosses between the two until assembly, which is why a workshop that runs both can match a steel leg to a timber back without a second supplier.

The records that should exist

Kiln charge sheets. Powder batch and salt-spray coupon. Cover roll numbers per order. The signed sample with photographs. The packing list per block.

Five documents. Workshops that keep them can answer a question about a chair delivered three years ago. One that does not will answer with a new chair, which is not the same thing.

How a quotation is built

Frame 35–45% of FOB, upholstery 20–30%, finish 10–15%, packing 3–4%, and the rest is labour and overhead.

When two quotes for the same drawing differ by 25%, the difference sits in one of those four lines and it is usually the frame — thinner stock, a dowel joint instead of a mortise, or a spliced post. Ask for the cutting list; it shows up there before it shows up on a loading bay.

What a visit should cover

Walk the timber store first, not the showroom. Board sizes tell you what can be cut in one piece. Then the machining area for jigs, then the kiln records, then packing.

Save the finished-goods area for the end. Everything looks right when it is stacked and wrapped, which is exactly why it is the least informative room in the building.

What cannot be checked remotely

Hand feel on a finish, the sound of a joint when the frame is flexed, and whether the sample room is a real department or a corner with a bench in it.

Everything else can: dimensions on a returned sample, moisture records, photographs of end grain, and a coupon from the powder line. Ask for those four before booking a flight.

Notes in this guide

24 Nov 2026·Factory
What a Furniture Factory Audit Actually Checks
Most audits score a building. The useful ones score four processes, and two of them are about paperwork rather than machines.
24 Nov 2026·Factory
How to Spend Four Hours in a Factory
A factory visit is a sequence, not a tour. Start where the timber comes in and finish where the cartons leave.
24 Nov 2026·Factory
Workshop Layout: Why Flow Decides Quality
Parts that travel twice get damaged twice. Layout is the cheapest quality control a factory has.
24 Nov 2026·Factory
Machining Tolerances in Timber: What Is Achievable
Wood moves with the weather. The tolerance written for steel is a tolerance nobody can hold in a chair factory.
24 Nov 2026·Factory
CNC or Hand Work: Where Each One Belongs
CNC gives repeatability. Hand work gives the fit a machine cannot judge. Every chair uses both, in different places.
24 Nov 2026·Factory
Sanding: The Stage That Decides the Finish
Paint does not hide a scratch, it highlights it. Sanding is the least visible and most decisive process in the shop.
24 Nov 2026·Factory
Inside a Spray Booth: What Decides a Finish
Same lacquer, same colour, two different results. The variables are air, temperature, film thickness and time.
24 Nov 2026·Factory
Kiln Capacity: The Bottleneck Nobody Asks About
A factory can machine 500 chairs a week and dry timber for 300. The kiln is the real capacity figure.
24 Nov 2026·Factory
Inside the Metal Shop
Cutting, bending, welding, grinding, coating. Five stages and one of them decides whether the frame is straight.
24 Nov 2026·Factory
The Packing Department: Last Chance to Catch a Defect
Packing is the final inspection station whether the factory treats it as one or not. Most defects are seen there and half are ignored.
24 Nov 2026·Factory
QC Stations: Where the Checks Actually Happen
One inspector at the end catches 60% of defects. Four checks along the line catch most of them before they become scrap.
24 Nov 2026·Factory
First Article Inspection: The Check That Stops 200 Rejects
The first chair off a new run is measured against the drawing, not against the sample. Everything after it inherits the result.
24 Nov 2026·Factory
Jigs and Tooling: The Hidden Asset in a Chair Order
A chair is a set of jigs with timber around it. The jigs are why the second order matches the first, and why a new supplier cannot.
24 Nov 2026·Factory
Capacity Per Month: The Number Behind Every Lead Time
Ask a factory how many chairs a month and the answer is usually a maximum. The useful figure is what is left after existing orders.
24 Nov 2026·Factory
Skill on the Floor: What Training Actually Changes
A welded frame and a dowelled frame come off the same bench. The difference is what the person at that bench was taught.
24 Nov 2026·Factory
What Gets Subcontracted, and What Should Not
Every factory subcontracts something. The question is which processes, and whether anyone is inspecting them.
24 Nov 2026·Factory
Shifts, Overtime and What They Do to Quality
A second shift doubles capacity on paper. In a chair factory it usually means the night team has the older equipment and the newer staff.
24 Nov 2026·Factory
How Timber Is Stored Decides What You Receive
Dried timber left in a humid shed goes back to 14%. Storage is the step between the kiln and the machine, and it is where moisture returns.
24 Nov 2026·Factory
Offcuts: What Waste Says About a Cutting List
A chair factory generates 40% waste by volume. Where that number goes decides whether your quotation is competitive.
24 Nov 2026·Factory
Machine Maintenance: The Source of Batch Variation
A worn cutter burns instead of cutting, and the burn shows up 200 parts later as a finish defect nobody can trace.
24 Nov 2026·Factory
OEM or Own Design: What Changes in the Order
One route makes your drawing. The other makes their chair with your label on it. The difference is who owns the risk.
24 Nov 2026·Factory
How a Chair Quotation Is Built
Material, labour, overhead, packing, margin. Five lines, and only one of them is worth arguing about.
24 Nov 2026·Factory
Drawings a Factory Can Actually Build From
A rendering and a photograph is a brief, not a drawing. Three views and a joint detail turn it into something buildable.
24 Nov 2026·Factory
Photographs That Prove Progress
Ten photographs of a factory floor prove nothing. Four photographs with a label and a date prove a batch exists.
24 Nov 2026·Factory
Packaging: Where Damage Is Prevented or Designed In
Most transit damage is decided by a carton design, not by the driver. Four cartons, four failure modes.
24 Nov 2026·Factory
What Quietly Changes Between Sample and Production
The sample was perfect. The delivery is 6% lighter. Five substitutions happen without anyone writing them down.
24 Nov 2026·Factory
Factory or Trading Company: The Honest Trade-Off
A trading company is not a mark-up on nothing. It is coordination, and coordination is what a multi-product order needs.
24 Nov 2026·Factory
The Sample Room: What to Look at in Ten Minutes
A showroom is arranged for buyers. The sample room is arranged for work, and that is where the information is.
06 Oct 2026·Factory
From Sample to Reorder: What Stays on File
The value of a sample is not in the approval. It is in what it lets the factory do two years later without asking again.

Drawing to check?

Send it over. We will mark the joints, the species by part and the sizes that need confirming.

Send the drawing →