Qinghe.
EN
Home / Blog / Factory / 06 Oct 2026

From Sample to Reorder: What Stays on File

The value of a sample is not in the approval. It is in what it lets the factory do two years later without asking again.

Part of the factory guide — Inside a Chair Workshop in Lecong
From Sample to Reorder: What Stays on File

The signed sample is the reference

One piece is built first and kept in the workshop. Every later batch is checked against it rather than against a photograph, which is the only way a colour and a stitch line stay matched across years.

Drawings carry revision numbers

Any change to a drawing is a revision with a number on it, and the number goes on the packing list. Without that, a change made for one outlet quietly migrates into the next order.

Roll numbers and batch numbers

Cover roll numbers and powder batch numbers are recorded against each order. Any re-cover or replacement chair ordered later is matched from that record rather than from a colour name that may have been re-formulated.

What to ask a supplier for

Ask for the specification sheet, the revision number on the drawing and the batch record, not just a sample. Suppliers who cannot produce the record will not be able to match the piece in three years.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →