What Gets Subcontracted, and What Should Not

Every factory subcontracts something. The question is which processes, and whether anyone is inspecting them.

Part of the factory guide — Inside a Chair Workshop in Lecong

What usually goes out

Powder coating, chrome plating, glass, stone, and sometimes foam moulding. Processes that need expensive equipment and run in batches for many customers.

Also sewing, on large covers, and CNC machining when the shop is full.

What should stay in

Frame assembly, joint machining and final finishing. Those three decide whether the chair matches the sample, and outsourcing them means the tolerance path has a break in it.

Upholstery is arguable: a shop with its own benches controls tension; a shop that sends covers out does not.

The risk to your order

Subcontracted finishing is the common failure. Four-stage: degrease, rinse, conversion coating, dry. The coating shop running a hundred customers uses one pretreatment line, and your frames arrive with someone else's handling marks.

Then colour: a plating or coating batch mixes with other customers' work and your RAL drifts.

What to ask

Which processes go out, to which suppliers, and who inspects their output. Then ask for the coating supplier's salt spray result, not the chair factory's.

Coating standards sit in powder coat prep, and audit scope in what a factory audit looks for.