How a Contract Chair Is Built

Chairs fail at a joint, almost never in the middle of a part. The timber or the tube is the easy bit; the question is what happens where two parts meet and a guest leans back.

So this guide works through the frame joint by joint, with the loads and the details that hold them. Every note on this site about frames comes back to these four points.

The loads, in numbers

Contract seating is tested at EN 16139 level 2 (contract) — static load 1,600 N on the seat, 560 N on the back. Put plainly: sit down hard, then lean back with your weight on the backrest. The seat takes roughly three times the load of the back, but the back is where the frame flexes, so the joint at the top of the leg does more work than its share of the number suggests.

The chair also gets dragged, tipped onto two legs and used as a step. None of that is in the standard and all of it happens in a buffet hall at eight in the morning.

Four joints, and what each one is for

Mortise and tenon. 10–12 mm mortise, 25–35 mm deep, glued and pinned. The strongest option for a timber frame and the one that takes the back load best. Costs more because it is slower to machine.

Dowel joint. three 8 mm or 10 mm beech dowels per corner, 30 mm into each part. Common on mid-price frames. Three dowels per corner is fine for a side chair in a guest room; two is where it starts to rack.

Corner block. glued and screwed block behind the leg and rail, hidden under the seat. This is the detail that decides whether a dowel frame survives. Corner blocks are cheap and it is the first thing to disappear from a cheap quotation.

MIG weld. 1.2–1.5 mm wall tube, 360° fillet, ground before powder. On steel frames the weld replaces all three of the above, and the quality question moves to penetration and post-weld cleanup.

Steel frames: the four numbers

16–25 mm diameter round, or 25 × 25 mm square tube at 1.2–1.5 mm wall. Thinner than 1.2 mm and the tube dents at the leg where it meets the floor; thicker than 1.5 mm and the chair is heavier than the job needs.

Pretreatment is four-stage: degrease, rinse, conversion coating, dry. Skip a stage, usually the conversion coating, and the powder adheres to a surface that is not bonded to the steel. It looks fine and lifts in sheets after two years of cleaning chemicals.

Powder at 60–80 micron, cured at 180–200 °C, tested at 500 hours neutral salt spray on a test coupon per batch. Ask for the coupon, not the certificate — a coupon is a physical part from the actual batch.

The seat, from pan to cover

12 mm birch plywood, stapled, or elastic webbing at 50 mm centres. 35–45 kg/m³ for seat pads, 25–30 kg/m³ for backs, 40–50 mm seat, 20–30 mm back. Below 35 kg/m³ foam the seat bottoms out under a 90 kg guest within a year, and the cover then takes the wear the foam should have absorbed.

Moulded foam at 45–55 kg/m³ moulded foam is what a shaped seat needs. Cut foam on a flat pan gives the same comfort everywhere, which is why cheap chairs feel fine in the showroom and hard after an hour.

What fails first, in order

Front leg joint at the seat rail. Back post at the height of the seat. Corner block glue line. Then the seat foam, then the cover, then the finish. The frame outlives the upholstery by years, which is why the re-cover question belongs in the specification.

If a chair comes back broken in the first year, the failure is almost always in the first two items on that list, and both of them are hidden under the seat when the chair is standing normally.

Notes in this guide

24 Nov 2026·Construction
Mortise and Tenon or Dowel
Both hold a chair together. One holds it for fifteen years, and the difference is visible on the quotation as a line item nobody reads.
24 Nov 2026·Construction
Corner Blocks Stop the Rack
Racking is the sideways twist a chair takes when a guest drags it back. One block of wood behind the corner is the cheapest fix in furniture.
24 Nov 2026·Construction
Wall Thickness on a Steel Chair Frame
1.2 mm or 1.5 mm is not a rounding decision. It is the difference between a frame that dents at the leg and one that does not.
24 Nov 2026·Construction
The Four Stages Before the Powder
Powder coat does not fail because the powder was wrong. It fails because the steel under it was not prepared.
24 Nov 2026·Construction
What a Good Weld Looks Like Under Powder
The coating hides everything. Which is why the weld check happens before the frame goes into the oven, and why a coupon matters more than a certificate.
24 Nov 2026·Construction
Knock-Down or Fixed: Where Each Belongs
Knock-down saves freight and costs rigidity. On a booth it is the right answer. On a dining chair it usually is not.
24 Nov 2026·Construction
Table Base Spread and the Tip Test
A four-top tips because the base is too small for the top, not because the table is light. The fix is 100 mm of spread.
24 Nov 2026·Construction
Glides: The Cheapest Part on the Chair
A 20-cent glide decides whether the floor survives and whether the frame dents. It is also the part most often left off a specification.
24 Nov 2026·Construction
What Makes a Chair Stack Properly
Stacking is a frame geometry question, not a marketing word. The number that matters is millimetres per chair, not how many high.
24 Nov 2026·Construction
The Arm Joint Is Why Armchairs Break First
Guests use arms as handles. That single habit puts a bending load into the smallest joint on the chair.
24 Nov 2026·Construction
Screws Pulling Out of Seat Rails: Why It Happens and What Holds
The screw is not the problem. Where it goes and how the load reaches it is. Three fixes, in order of cost.
24 Nov 2026·Construction
Fixing a Top to a Base: Through-Bolt, Hanger Bolt or Figure-Eight
Three fixings, three behaviours when the top moves. The wrong one cracks tops in the first heating season.
24 Nov 2026·Construction
Threaded Inserts in Timber: The Difference Between a Knock-Down That Lasts and One That Strips
Knock-down furniture lives or dies on one small piece of steel. Four types, and only two are worth using on a hotel chair.
24 Nov 2026·Construction
Tapered Legs: Where the Section Runs Out of Strength
A leg tapered to 22 mm at the floor looks right and fails at the wrong place. The taper has to stop before the joint does.
24 Nov 2026·Construction
Apron Depth and Top Sag: The Number Nobody Checks
A 750 mm four-top with a 60 mm apron does not sag. The same top with a 40 mm apron sags 2 mm under a stack of plates, and 2 mm is visible.
24 Nov 2026·Construction
Welded Steel Frames: Where Distortion Comes From
A welded chair frame comes out of the jig twisted, and the jig was straight. Heat goes in on one side of the section and pulls the tube towards it.
24 Nov 2026·Construction
Powder Coat Colour Matching Across Batches
RAL 7016 on one order and RAL 7016 on the next are not the same grey. The powder is the same code and the film is a different thickness.
24 Nov 2026·Construction
Rust at Weld Seams: The Failure Powder Coat Cannot Cover
Rust starts in the seam beside a weld, not on the weld. Two sharp edges, a gap of 0.2 mm and no way for the pretreatment to reach inside.
24 Nov 2026·Construction
Chrome, Powder or Plating: What Each One Costs You in Service
Three finishes that look like metal, three very different repair stories. One of them cannot be touched up at all.
24 Nov 2026·Construction
Table Base Plates: Thickness, Footprint and the Wobble Test
Pedestal bases fail in three ways, and all three come from a plate that is 2 mm too thin or 100 mm too small.
24 Nov 2026·Construction
Pedestal or Four Legs: Choosing by Room, Not by Photograph
Four legs are stable and annoying. Pedestals are generous and tip. The room decides which problem you would rather have.
24 Nov 2026·Construction
Folding Table Mechanisms: What Wears First
Folding tables are mechanisms with a top attached. The top lasts ten years and the hinge lasts three, which is why banquet stock gets replaced early.
24 Nov 2026·Construction
Booth Frames: Welded or Knock-Down
Welded booths arrive in one piece and cannot get up the stairs. Knock-down booths arrive flat and rattles if the joints are wrong.
24 Nov 2026·Construction
Fixing a Booth to the Wall Without Breaking Either
Unfixed booths move. The booth fixed rigidly to a moving wall cracks the plaster and then the frame. There is a bracket for this.
24 Nov 2026·Construction
Uneven Floors: What Adjustable Glides Can and Cannot Fix
Adjustable feet solve 5 mm. Beyond that you are shimming, and beyond 15 mm the floor is the problem, not the furniture.
24 Nov 2026·Construction
Armrests Take More Load Than Seats Do
Guests push down on an arm to stand. That is 40 kg on a 20 mm part, and it happens twice per cover.
24 Nov 2026·Construction
Castors on Banquet Chairs: Where They Help and Where They Chew the Floor
Five hundred chairs moved twice a day is a handling problem, not a seating problem. Castors solve it and create two others.
24 Nov 2026·Construction
Dollies and Trolleys: The Hardware That Decides Stack Height
A stack of ten chairs and a dolly that takes eight means the tenth chair is carried. The dolly specification belongs in the chair order.
24 Nov 2026·Construction
Joinery Tolerance: Why the Sample Fits and the Delivery Does Not
The sample was hand-fitted by the best person in the shop. The production run was not, and the tolerance was never written down.
24 Nov 2026·Construction
Dowel Spacing and Glue Coverage: What a Dowel Joint Actually Needs
Three dowels badly placed hold less than two placed well. Spacing and glue are the whole joint, and both are invisible after assembly.
24 Nov 2026·Construction
Fixing a Seat Deck to a Steel Frame
A plywood deck on a steel tube is two materials that move differently, held together by fasteners that pass through both.
24 Nov 2026·Construction
Spares and Repair Kits Worth Ordering With the Chairs
One loose glide closes a chair out of service for a week if there is no spare. The kit costs 2% of the order and saves the room.
24 Nov 2026·Construction
Handover Inspection for 200 Chairs in One Afternoon
Unpack everything and you will still miss the batch problems. Sample by carton, test by load case, and write it down while the truck is there.
24 Nov 2026·Construction
Corner Joints in a Booth: Where the Carcass Fails
A booth corner takes the load of everyone leaning into it. Two screws into board is not a joint, it is a hinge with friction.
24 Nov 2026·Construction
Extension Tables and Leaves: The Joint That Decides the Table
A leaf table is a table with a gap in the middle and a mechanism to close it. The gap is where every one of them fails.
24 Nov 2026·Construction
The Racking Test: One Minute per Chair, Ten Years of Information
Racking is the load that kills chairs: side to side, foot to seat, over and over. It takes a minute to test and almost nobody does it.
24 Nov 2026·Construction
Steel or Timber Frame: Where the Money Actually Goes
Steel looks cheaper on the tube price and often is not, once coating, welding and packing are counted. The split depends on the shape.
24 Nov 2026·Construction
Steel or Timber in Service: Ten Years of Difference
Both survive a decade. They fail in different places, at different times, and one of them can be repaired in the room.
24 Nov 2026·Construction
Matching Metal and Timber on the Same Chair
A steel frame with oak arms is two finishes pretending to be one product. They read as a pair or as a mistake, and the difference is warmth.
24 Nov 2026·Construction
Chairs on Carpet: Glides, Sinking and the Seat Height Nobody Recalculates
A thick carpet costs 15 mm of seat height. Nobody adjusts the table, and then the chairs feel wrong for reasons the guest cannot name.
25 Nov 2026·Construction
Table Top Edges: 3 mm Banding or a 30 mm Lipping
The same 25 mm top with a banded edge and a lipped edge looks identical on a sample. They part company in month eighteen, at the edge a cloth gets wrung out over.
20 Oct 2026·Construction
Reading a Booth Elevation: Length, Joint Position and Back Height
Booth runs are joinery as much as seating, and the drawing they come from has three numbers that decide whether they fit.

Drawing to check?

Send it over. We will mark the joints, the species by part and the sizes that need confirming.

Send the drawing →