Qinghe.
EN
Home / Blog / Construction / 24 Nov 2026

Steel or Timber Frame: Where the Money Actually Goes

Steel looks cheaper on the tube price and often is not, once coating, welding and packing are counted. The split depends on the shape.

Part of the construction guide — How a Contract Chair Is Built

Cost structure by part

35–45% of fob of FOB for a timber frame; steel frames sit at 30–40% because tube is cheap and welding is not. The rest of the cost — upholstery, finish, packing — is similar for both.

So the frame is where a 10% saving exists, and it is also where the durability lives. Cutting the frame to save 5% of FOB is how a chair ends up in a skip in year four.

Where steel wins on cost

Simple shapes with few bends: four legs, a seat ring, a back hoop. Welding is repetitive and jigs are cheap. Powder coat is one process for the whole frame.

Stacking chairs suit steel for the same reason: a strong, light frame with a simple geometry.

Where timber wins

Shaped parts, arms, curves and anything with a visible joint. Machining a curved ash back costs less than bending and welding tube to the same profile, and the result is lighter.

European beech frames also need no coating line beyond a spray booth, so a small order in timber is cheaper than a small order in steel with its pretreatment stages.

The hybrid nobody quotes

Timber legs and back with a steel seat frame and steel connectors. Common in contract furniture and rarely offered unless asked for. It gives timber where guests look and steel where the load is.

Cost breakdowns sit in the factory guide, and the steel specification in steel tube wall thickness.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →