Qinghe.
EN

Guides

Nine working guides. Each one holds the numbers the notes refer back to.

Timber
Chair Timber: What Actually Holds a Guest Up
Eight species, what each one is good for on a chair, and why moisture content ruins more frames than the choice of timber ever does.
40 notes
Construction
How a Contract Chair Is Built
Where a chair carries load, which joint holds it, and the four points that decide whether the frame is still tight in year five.
42 notes
Upholstery
Upholstery: Foam, Seams and What Housekeeping Does to Them
Foam density, cover abrasion, seam construction and the cleaning routine that decides whether a cover lasts three years or eight.
32 notes
Lead Time
Where the 25 to 35 Days Actually Go
The production steps behind a contract chair, where a date slips, and the packing and container maths that decide what arrives intact.
31 notes
Factory
Inside a Chair Workshop in Lecong
The five lines a contract chair passes through, the records that should exist, and how a quotation is actually built.
29 notes
Specifying
Specifying Seating Without Guesswork
The five numbers that fix a chair to a room, what belongs on a drawing, and how many spares a 120-key property actually needs.
40 notes
Restaurant Furniture
What Makes a Chair Survive a Hotel Restaurant
Contract test levels, weight, stack pitch and the four details that separate a hotel restaurant chair from a domestic one.
27 notes
Opening
Furniture for a Hotel Restaurant, in the Right Order
What has to be decided before a PO, what arrives late, and the eight-month sequence from layout freeze to first service.
30 notes
Design
Hotel Restaurant Layout: The Numbers Behind the Plan
Aisle widths, table spacing, seat mix and banquette depth, with the figures that keep a plan workable once service starts.
33 notes