Handover Inspection for 200 Chairs in One Afternoon

Unpack everything and you will still miss the batch problems. Sample by carton, test by load case, and write it down while the truck is there.

Part of the construction guide — How a Contract Chair Is Built

Sample by carton, not by chair

Chairs are packed in sequence, so one carton tells you about the ten around it. Open the first, middle and last carton in each row — nine cartons out of a 200-chair delivery — and inspect one chair from each.

That catches a batch-level defect. It does not catch a single bad chair, which is why the last step is a 100% visual pass on the floor line and the seat.

The four tests

Rock test. Flat surface, press each corner. Any movement is a leg out of plane.

Seat load. Full body weight on the front edge for five seconds. Listen for a creak.

Back load. Lean back hard with one hand on the top rail. Watch the joint at the seat.

Arm load on armchairs. Full weight on the arm tip, hold five seconds.

What to photograph

The carton label, the chair from three angles, the defect with a ruler in frame, and the floor line in the room. Four photographs per claim, timestamped, taken before the cartons leave the dock.

Claims made on the day get settled. Claims made after installation become a discussion about who damaged what.

The record that ends arguments

One page per delivery: date, carton count, sample cartons opened, tests done, defects found, photographs referenced, and a signature from both sides. It takes two hours and it is the only document that matters at month eighteen.

Pre-shipment inspection is the other end of the same process, covered in pre-shipment inspection. Test standards sit in the construction guide.