What a Pre-Shipment Inspection Should Cover

Ninety minutes, five checks, and a report with photographs. Without it, the first time anyone sees the chairs is on site.

Part of the lead time guide — Where the 25 to 35 Days Actually Go

The five checks

Quantity against the packing list. Dimensions against the approved sample. Finish against the chip. Cover against the roll record. Joint and frame check on a random five.

Five checks, 2–3 days of schedule, and the last chance to fix anything before a container is sealed.

Sampling, not everything

Inspect 10% of the order, minimum five pieces, chosen from the middle of the production run rather than the top of the stack.

The first and last pieces are always the best. The middle is what you are buying.

What the report should contain

Photographs of each check, the measurements written down rather than described, and a pass or fail per item. Then a snag list with a date for each item.

Reports that say "quality good" are not reports.

Who does it

Us, with photographs, and then a third party if the buyer wants one. Third-party inspection costs a few hundred dollars and removes the argument about who looked.

Timing is covered in the lead-time guide; the frame checks in the construction guide.