Incoterms on a Furniture Order, Plainly

EXW, FOB, CIF, DDP. Four letters that decide who owns the risk at each point, and which one a hotel project should use.

Part of the lead time guide — Where the 25 to 35 Days Actually Go

What each one means here

EXW: the buyer collects from the factory gate. Cheapest on paper and the most work in practice, because the buyer arranges export clearance.

FOB: the seller delivers to the vessel and clears export. The standard for furniture from China.

CIF: the seller also pays freight and insurance to the destination port. Convenient, and the insurance cover is usually minimum.

DDP: the seller delivers duty paid to the door. Simplest for the buyer and rarely offered on furniture because duty rates vary by country.

Where the risk actually sits

Under FOB the risk transfers when the cargo is on the vessel. That means the voyage, the transhipment and the port delay are the buyer's problem, which is why marine insurance is not optional.

Under CIF the seller arranges it, and the buyer should read the cover. Institute Cargo Clauses C is common and excludes most water damage.

What we quote

FOB Foshan by default, with CIF on request. Production is 25–35 days after sample sign-off, and the freight window after that is outside either party's control.

Which is why the date to plan against is the arrival date, not the production date.

The line that avoids arguments

"FOB Shenzhen, risk transfers on loading, buyer's marine cover from that point."

One line in the PO. The rest is in the lead-time guide, and the packing that protects the cargo in transit is covered in packing an order with fourteen models.