Lead Time

Sampling, production steps, packing and the container maths.

Start with the lead time guide — The production steps behind a contract chair, where a date slips, and the packing and container maths that decide what arrives intact.
24 Nov 2026·Lead Time
How Long a Sample Really Takes
Seven to fifteen days, and the difference is whether the shape already exists.
24 Nov 2026·Lead Time
Five Things That Hold a Container
Production finishes on time and the container still misses the vessel. These are the five reasons, in order of frequency.
24 Nov 2026·Lead Time
Packing an Order With Fourteen Models
Mixed orders are packed by destination, not by product. Get that wrong and the site unpacks fourteen piles to build one room.
24 Nov 2026·Lead Time
Incoterms on a Furniture Order, Plainly
EXW, FOB, CIF, DDP. Four letters that decide who owns the risk at each point, and which one a hotel project should use.
24 Nov 2026·Lead Time
What a Rush Order Can and Cannot Shorten
Machining can be doubled with a second shift. Drying cannot. That is the whole answer.
24 Nov 2026·Lead Time
Planning Around the Spring Festival
Four weeks of shutdown and two weeks of slow restart. Orders placed in January arrives in April.
24 Nov 2026·Lead Time
What a Pre-Shipment Inspection Should Cover
Ninety minutes, five checks, and a report with photographs. Without it, the first time anyone sees the chairs is on site.
24 Nov 2026·Lead Time
Loading a 40HQ Without Wasting a Cubic Metre
Sixty-eight cubic metres, packed by hand in six hours. The plan decides whether the last twenty chairs fit.
24 Nov 2026·Lead Time
Set the Install Date, Then Work Backwards
Opening dates do not move. Production dates do. Only one of them is worth planning from.
24 Nov 2026·Lead Time
Volume Weight and Why Chairs Cost What They Do to Ship
Furniture ships by volume, not by weight. That is why a light chair and a heavy one cost the same to move.
24 Nov 2026·Lead Time
How Long a Repeat Order Really Takes
Repeat orders skip sampling and skip nothing else. The saving is two weeks, not two months.
24 Nov 2026·Lead Time
Booking a Production Slot, Not Just Placing an Order
The order is confirmed and the workshop is full for three weeks. The lead time clock starts when the line is booked, not when the deposit lands.
24 Nov 2026·Lead Time
Material Lead Times: Timber, Cover and Foam
Production is 25 days. Getting the cover in the right colour can take 40. Material is what actually decides the date.
24 Nov 2026·Lead Time
The Sample Room Queue Nobody Warns You About
Sample rooms are small and everyone wants samples in the same month. The queue is why a two-week sample takes five.
24 Nov 2026·Lead Time
Deposit Timing and When Materials Actually Get Released
The deposit clears on Friday and the timber is released on Monday. Between those two dates sits a purchase order nobody sent.
24 Nov 2026·Lead Time
When the Cover Is Late: Four Options and Their Costs
Frames are finished and the cover arrives in three weeks. Four ways out, and only one of them protects the delivery date.
24 Nov 2026·Lead Time
FCL or LCL: The Break-Even for Furniture
Furniture is bulky and light, which is the worst combination for LCL. The break-even sits lower than most buyers expect.
24 Nov 2026·Lead Time
Consolidating Three Suppliers Into One Container
Three factories, one container, one departure. The maths works until one supplier is three days late.
24 Nov 2026·Lead Time
Sailing Schedules and Port Congestion
The quoted transit time is port to port and the container sits at anchor for six days. That six days is not in the schedule.
24 Nov 2026·Lead Time
Documents for Clearance: The List That Stops a Container
Customs does not hold cargo for the goods. It holds them for a missing certificate, and the container waits at your cost.
24 Nov 2026·Lead Time
Delivery Day: The Checklist That Saves a Week
Truck arrives, nobody knows where the goods go, and 200 cartons sit in a corridor. Two hours of planning prevents that.
24 Nov 2026·Lead Time
Site Readiness: Nine Things That Must Be True
Furniture arriving into a wet building is furniture stored in a humid room. Site readiness is a condition of delivery, not a courtesy.
24 Nov 2026·Lead Time
Installation Labour: How Many People for 200 Chairs
Two people can install 200 chairs in a day if the cartons are sorted by room. Four people take two days if they are not.
24 Nov 2026·Lead Time
Cartons, Foam and Pallets: The Waste Nobody Budgets
Two hundred chairs arrive in 200 cartons with foam, plastic and pallets. Getting that off site is a cost line, not a detail.
24 Nov 2026·Lead Time
The Punch-List Week: What Gets Fixed and What Gets Deferred
Forty items on the list, five days before opening. Sorting them by what guests see is the only way through.
24 Nov 2026·Lead Time
Seasonal Capacity in Foshan: The Year in Four Quarters
Everything is possible in June and nothing is possible in December. The workshop calendar decides more dates than the quotation does.
24 Nov 2026·Lead Time
Reading a Production Report: Four Numbers That Tell the Truth
Progress reports say 'on schedule' until the day they do not. Four numbers turn the sentence into evidence.
24 Nov 2026·Lead Time
Air Freight: When It Is Cheaper Than Waiting
Air freight costs eight to twelve times sea. It still pays for itself on parts, samples and any delay that would move an opening date.
24 Nov 2026·Lead Time
Free Time, Demurrage and the Bill Nobody Expects
The container arrives, the site is not ready, and the port charges per day. Free time is a number on the booking that decides the cost.
14 Oct 2026·Lead Time
Packing by Room Block: How a 120-Key Delivery Stays Sorted
Furniture for a hotel under fit-out does not fail at the factory. It fails on the loading bay, when 120 identical rooms arrive as one unmarked pile.