Set the Install Date, Then Work Backwards

Opening dates do not move. Production dates do. Only one of them is worth planning from.

Part of the lead time guide — Where the 25 to 35 Days Actually Go

The backward sequence

Install date, minus snag week, minus freight, minus production, minus sampling, minus approval. Working forwards from a PO gives a date that arrives after the opening.

Roughly: 4–5 months from approval to install on a sea shipment.

Where the sequence breaks

Approval takes three rounds instead of one. Freight is booked late. The room is not ready when the container lands and the furniture goes into storage — which costs money and delays the snag list into the opening week.

What to fix first

Freeze the layout and the finish early. Everything downstream — sampling, cover, production — is faster when those two are settled.

Then book freight at PO, not at completion. That single habit removes two weeks from most projects.

The number to keep

25–35 days after sample sign-off for production, 30–45 days for freight, one week for install and snag. That is the spine of the plan.

The steps are in the lead-time guide, and the room-side sequence in the restaurant setup guide.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →