Air Freight: When It Is Cheaper Than Waiting

Air freight costs eight to twelve times sea. It still pays for itself on parts, samples and any delay that would move an opening date.

Part of the lead time guide — Where the 25 to 35 Days Actually Go

The arithmetic

Air on 200 kg of chair parts is a few hundred dollars. Sea on the same is a hundred and takes five weeks. The difference is two weeks of a room being closed, which is worth more than the freight.

On 200 chairs, air is not viable — the volume kills it. Air is for dense, high-value, low-volume.

What to fly

Samples, cover lengths, glides, arm caps, a single chair for a photo shoot, and the parts that stop an installation.

Also: the one missing model in a mixed order, where the room cannot open without it.

How to make it fast

Consolidate into one shipment, use the supplier's forwarder if they have a good one, and pre-clear customs with the documents sent ahead.

Door to door, air is five to seven days with clearance. The week with a query.

When not to

Bulky items with low value: booth frames, table tops, anything over 1 m³ per 100 kg. The volumetric charge makes it absurd.

Freight options sit in container versus LCL, and delay planning in what happens when a cover is late.