The deposit clears on Friday and the timber is released on Monday. Between those two dates sits a purchase order nobody sent.
Deposit received, then a purchase order to the timber mill and the cover supplier. Those orders have their own lead times, and they do not start until the deposit clears.
Which is why a "25 day" production window is really 25 days plus the material that was not in stock.
Which materials were in stock at order date and which were ordered. Then the expected arrival date for each. That list is the real schedule.
The supplier who says everything is in stock and then reports a four-week cover lead is telling you the stock check happened after the promise.
Where the cover is a mill order, paying for it at order stage removes it from the critical path. That is 20–30% of the order value committed early, and it is normal practice on custom colours.
On standard covers and species, the deposit structure is enough.
Ask for a material status list with the weekly progress report: item, ordered, arrived, inspected. Four columns that reveal a slip two weeks before it becomes a delay.
Progress reporting sits in how to read a production report, and payment structure in payment terms and deposits.