Packing by Room Block: How a 120-Key Delivery Stays Sorted

Furniture for a hotel under fit-out does not fail at the factory. It fails on the loading bay, when 120 identical rooms arrive as one unmarked pile.

Part of the lead time guide — Where the 25 to 35 Days Actually Go
Packing by Room Block: How a 120-Key Delivery Stays Sorted

One list per block

Cartons are marked to the floor or room block on the drawing, with a packing list per block inside the first carton. The site can then sort by block before it unpacks anything, which is the difference between a two-day and a two-week install.

Sets stay together

On a room set, the table and chairs for one key are packed as a unit rather than by product type. Mixing them across a container is cheaper at the factory and more expensive at the property.

Spares in the last carton

Spare glides, bolts and a touch-up pen travel in the final carton of each block. It is a small line on the packing list that saves a maintenance call in month two.

What the paperwork has to say

The packing list, the specification sheet and the signed sample reference belong in the same envelope. When a replacement piece is ordered two years later, that envelope is what keeps it matched.