Truck arrives, nobody knows where the goods go, and 200 cartons sit in a corridor. Two hours of planning prevents that.
Route from the gate to the room, lift dimensions, and a nominated person with authority to sign. Three items, and one of them fails on most sites.
Then floor protection along the route and a holding area if the room is not ready.
Count cartons against the packing list before signing. Photograph the container or truck interior as it opens, and any damaged carton with the label visible.
Then check the seal number against the bill of lading. The broken seal is a claim before anything is unpacked.
By room, not by model. The delivery sorted by model means every room gets built from six piles in a corridor. Sorted by room and each room is one pile.
That is why room-block packing matters at the factory, covered in room block packing.
Keep the packing list with the carton labels. Two weeks later, a missing item needs both.
Site readiness sits in site readiness before delivery, and the install plan in install date backwards.