Forty items on the list, five days before opening. Sorting them by what guests see is the only way through.
Blocks opening: missing tables, a banquette not fixed, anything unsafe. Fix first, whatever it costs.
Visible on opening day: a chipped leg, a mismatched cover, a rocking chair. Fix second.
Cosmetic and hidden: a scuff under a seat, a loose glide under a banquet table in storage. Defer with a date.
Installation crew for fixing and adjusting. The factory for parts. Housekeeping for cleaning and cover care. Three parties, three lists, one coordinator.
Without a coordinator, every party assumes another one has the item.
Half of a punch list is parts: glides, screws, a cover patch, an arm cap. Those need to be in the spares box that arrived with the order, which is why spares are ordered at the start.
Parts air-freighted in punch week cost ten times the order price and arrive after opening.
One list, dated, with an owner and a status per line. Signed off when every line is closed or deferred in writing. That document is what stops the list reappearing in month three.
Handover records sit in handover inspection of frames, and spares in spare parts schedule.