Unfixed booths move. The booth fixed rigidly to a moving wall cracks the plaster and then the frame. There is a bracket for this.

Part of the construction guide — How a Contract Chair Is Built

What the fixing has to absorb

Two movements. The booth settles under load as guests sit and stand, which is millimetres. The building moves with temperature and settlement, which is also millimetres but in a different direction.

Rigid fixing takes both movements into the frame. Sliding brackets take one and leave the other in the seat, which is where it belongs.

The bracket that works

The steel angle screwed to the booth back and slotted to the wall, with a 10 mm slot and a washer. Tight enough to stop the run moving away from the wall, loose enough to slide sideways.

Two brackets per 1.5 m run, at 300 mm above the floor and at the top rail. Through the plaster into the substrate, not into the plaster — a fixing that only holds plasterboard holds nothing.

Where booths are not fixed at all

Free-standing islands, runs against glazing, and any booth specified as movable. Those need a heavier base and a low centre of gravity instead, because the wall is not doing any work.

Free-standing run at 1,000 mm high and 500 mm deep tips backwards if two people sit on the front edge. Fix it or widen the base.

Sequencing with the finishes

Fix brackets after the wall is painted and before the floor finish goes down. Brackets installed before plastering gets buried, which is fine, and a bracket installed after the floor is laid means lifting the run again.

Wall gaps and scribe details are covered in booth elevation, and the site sequence in the setup guide.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →