Qinghe.
EN
Home / Blog / Factory / 24 Nov 2026

Capacity Per Month: The Number Behind Every Lead Time

Ask a factory how many chairs a month and the answer is usually a maximum. The useful figure is what is left after existing orders.

Part of the factory guide — Inside a Chair Workshop in Lecong

Two numbers

Installed capacity and available capacity. About 120 in the workshop on five lines gives a monthly ceiling in the low thousands of chairs.

Available capacity in September is a fraction of that, because the lines are booked.

Where the ceiling sits

Kiln capacity, upholstery bench count and packing space. The shop with 20 benches and one kiln is limited by drying, not by sewing.

So the answer changes with the product: chairs with a simple cover are limited by frames, panelled backs by upholstery.

How to verify

Ask for the monthly output of your model over the last year. Then ask how many of that model are currently in production for other clients.

The supplier who can answer both is scheduling. One who cannot is improvising.

Planning with it

Split a large order across two shipments and two slots, and confirm both in writing. Booking 400 chairs into a month that already has 600 committed is how a 25-day lead time becomes 45.

Slot booking sits in production slots and booking, and seasonal effects in seasonal capacity in Foshan.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →