One route makes your drawing. The other makes their chair with your label on it. The difference is who owns the risk.
833 models in the range, all tooled, all with a known cost and a known lead time. No sampling cost and no tooling cost.
What you cannot do is change the seat height by 10 mm without becoming an OEM order.
Your drawing, their workshop. Sampling, tooling, first article, and a price that reflects the setup. Minimum quantities apply because the tooling has to be amortised.
You own the design and usually the tooling, and the risk of a drawing that does not work in production sits with you.
Standard frame from the range, modified: a different seat height, a different cover, a different finish. Most hotel orders are this, and it costs tooling for one operation rather than a new model.
It is also the fastest route. Two weeks instead of six.
Which parts of this chair are standard and which are new. Then the tooling cost and who owns it.
Sampling for OEM sits in sampling timeline, and the model range in the factory guide.
Send the floor plan and the seat count. Quote and finish chip in one reply.
Start a conversation →