The first chair off a new run is measured against the drawing, not against the sample. Everything after it inherits the result.
Every dimension on the drawing, the joint gaps, the seat height, the weight, and the finish against the approved chip. Then a photograph from four angles.
It takes an hour and it is the only point where a programming error can be caught before it repeats.
QC and the production supervisor, both. One signature means the check happened; two mean somebody with authority to stop the line has seen it.
Then the signed sheet goes with the batch. When something is wrong in month three, that sheet is the first document anyone asks for.
New model, new tooling, a change of timber batch, a change of cover, or a restart after a long gap. Five triggers, and most factories only do the first.
The one that catches people is the timber batch change: same species, different density, different machining behaviour.
The signed first article sheet for your order, with photographs. Then compare the seat height against the specification — 450–470 mm is where most variation hides.
QC records sit in QC stations and checks, and the sample comparison in the specifying guide.