One inspector at the end catches 60% of defects. Four checks along the line catch most of them before they become scrap.
Incoming material, after machining, after finishing, and at packing. Each has a different list and a different person.
Incoming: moisture, grade, dimensions. Machining: tolerance, grain direction, joint fit. Finishing: colour, film thickness, coverage. Packing: assembly, hardware, label.
By the time a chair reaches final inspection, a machining error has been through assembly, upholstery and finishing. Fixing it means stripping the chair.
Caught after machining, the same error costs a rail. That is the entire argument for in-process checks.
One sheet per batch with the check, the sample size, the result and the initials. Not a certificate — a working record that shows whether the process is stable.
Then the first article inspection for each new model or each change. En 16139 level 2 (contract) — static load 1,600 n on the seat, 560 n on the back is the static load reference.
The QC plan for your model, the last three batch records, and the name of the person who signs the pre-shipment report.
Pre-shipment procedure sits in pre-shipment inspection, and first article in first article inspection.