Three to five percent, held on site, in the same batch. Anything else is either too few or a storage bill.
The chair damaged on opening night waits five weeks for a production run if there is no spare. One damaged in year six is a reorder, not a spare.
Which is why spares are a first-year problem, and the number scales with the room, not with the property: 3–5% of chairs, rounded up to the next chair.
On site. Not in a supplier warehouse, not in a container that arrives three months later. The spare has to be reachable on the day of the damage, or it is not a spare.
Store them assembled and covered. Stacked spares get the top chair's seat compressed and the frame scratched, which defeats the point.
Booth runs are not spares, they are panels and seat pads. Damaged banquette sections are repaired with a panel, not replaced with a run.
Order 5% spare panels in the same batch and the same cover roll. Roll numbers recorded per order and matched on re-cover.
"Spares: 4% of chairs, same batch, same cover roll, delivered with the main order." One line.
Without it, a supplier will happily ship the order and quote the spares separately at sample price three months later, which is where the 4% becomes 6%.
Quantities by room type are covered in the specifying guide, and the cover record in the note on housekeeping.
Send the floor plan and the seat count. Quote and finish chip in one reply.
Start a conversation →