A 120-key hotel with three room types has four furniture lists. One total is how rooms end up short.
The single number tells a supplier how much to make and tells the site nothing about where it goes. Packing then has to be sorted on arrival, which is the expensive half of the job.
Counting by room type gives packing lists, install sequence and spares in one document.
Standard king, twin, suite, and the public areas. Public areas break down further — dining room, buffet hall, banquet, lobby waiting.
Each list gets its own model, quantity and finish. One suite that gets a different chair from the standard room is a decision, not an accident, and it belongs on paper.
Cartons marked per floor or per block, with a packing list on the outside. Then the install team sorts before unpacking rather than after.
That single marking decision is the difference between a two-day and a two-week install on a 120-key property.
Add 4% spares per room type, not on the total. Four percent of 400 chairs is 16; four lists rounded up individually is 4–8 more, which is roughly what actually breaks.
Room types and sizes are on dining sets, and the counting method is in the specifying guide.
Send the floor plan and the seat count. Quote and finish chip in one reply.