A chair leaves the workshop at 12% moisture and arrives at 9%. In between, the joints have moved. This is the cheapest thing on the specification to fix.
Target at packing is 8–10% at packing. Not because the workshop is humid — the drying happens before machining — but because of the voyage. a container crossing the tropics can push 8% timber to 13% and back; starting at 8–10% leaves room for the round trip
Timber at 12% going into a container that crosses the tropics will pick up two or three points on the way and lose them again in a dry warehouse. Every one of those points moves the mortise away from the tenon and back, and the glue line takes the damage.
Kiln-dried timber that is machined wet does not crack in the workshop. It machines beautifully. The mortise is cut at 12%, the tenon is cut at 12%, the fit is tight, the glue is good. Six weeks later the mortise has shrunk 0.3 mm across the 10 mm width and the tenon has not followed, because the tenon is end grain and end grain moves less.
What is left is a joint held by the pin and the glue skin, with a gap nobody can see under the upholstery. It survives a year of light use and fails at the back post on a chair that gets dragged across a floor twice a day.
Pin meter on 20% of the batch, cut test on one piece per kiln charge.
Ask for the kiln charge record: charge number, date in, date out, final moisture from the probe readings, and the equalising time. Workshops that run a proper schedule keep this as a one-page sheet per charge, because they need it themselves when a batch comes back from machining with movement.
Pin meters on finished chairs are close to useless. The reading changes with where you push the pin, whether you are on end grain or face grain, and whether the chair spent the night in an air conditioned showroom. If a supplier sends a photograph of a meter reading, they have sent you a photograph, not a record.
Proper drying costs time, and time costs kiln capacity. Roughly, a chair-part charge needs 5–7 days of schedule on top of air drying before it can be machined. That is already inside the 25–35 days after sample sign-off we quote, so it is not an extra — it is the reason the date is what it is.
Where buyers get hurt is the rush order. Pull a date forward by ten days and the days almost always come out of drying, because it is the only step with slack that nobody can see. If a supplier promises a shorter date without changing the timber source, ask which step they shortened. The answer tells you whether to accept the date. More on that in spliced posts and short offcuts, where the same logic shows up in the frame.
The hotel dining chairs that survive ten years in a buffet hall are not the ones with the thickest legs. They are the ones that went into the container at the right moisture.
Send the floor plan and the seat count. Quote and finish chip in one reply.
Start a conversation →