Glides, bolts, brackets and cam locks are 3% of the order value and 60% of the after-sales calls. They deserve their own schedule.
Without one, hardware is whatever the factory had in the bin. That means glides that do not suit the floor, bolts without a matching spanner, and brackets that have to be cut on site.
With one, the packing list matches and the maintenance team has a part number to re-order.
Glide type and diameter by floor, wall bracket type and spacing, table fixing type, and the assembly tooling. Then the spares quantity per item.
One page. Every item with a photograph and a part number, so somebody in year three can re-order without calling the sales manager.
Felt for stone and timber, nylon for vinyl, domed nylon for carpet, and a metal glide only where the floor is sealed concrete. The wrong one either scratches a floor or drags.
Get the floor finish schedule from the architect before specifying glides. Two lines in a schedule, and one of them is usually the wrong answer if it was written before the floors were chosen.
Hardware should be available for five years at a stated price basis. Without it, a 50 cent glide becomes a custom run.
Glide selection by floor sits in glides and floor protection, and the spares list in spare parts schedule.