Six pieces per line is generous until a hotel wants three chairs in one finish for a suite.
Our minimum is 6 pcs per line. That is per model per finish, because the changeover cost sits in the setup, not in the chair.
Two hundred chairs across 14 models and 3 finishes is 42 lines. Two of them might be under the minimum and those are the ones that hold up the container.
Suites and public areas. One suite with a different chair and a different finish is a small line, and small lines are what a hotel order is full of.
Either consolidate finishes to two, or accept that the suite chair comes from the standard range.
Sampling runs on an existing frame where possible, so a single piece can be built and shipped before the order is released.
7–10 days for a frame sample, 12–15 with cover and finish. That is the mechanism for testing a finish without buying a line's worth of chairs.
List every line with model, finish, quantity. Then check the lines under the minimum before sending, not after the quote comes back.
The commercial side of the order is in the specifying guide; the production side in the lead-time guide.
Send the floor plan and the seat count. Quote and finish chip in one reply.