What to Send With an RFQ

Five attachments turn a two-week exchange into a one-reply quote. Most buyers send one of them.

Part of the specifying guide — Specifying Seating Without Guesswork

The five

Drawing or reference image, quantities by model, finish and cover direction, delivery port and target date, and the project type.

Project type matters more than buyers think. Hotel restaurants have different priorities from a guest room, and the quote changes accordingly.

What a reference image does not do

It does not give dimensions. Photographs leave width, seat height and joint undecided, and every supplier will guess differently.

Send the image plus three numbers: overall width, seat height, and the seat depth you want. That is enough to quote without a drawing.

Dates

State the install date, not the order date. Production is 25–35 days after sample sign-off; freight adds 30–45 days. Targets that ignore freight produces a rush order that comes out of the drying schedule.

The one line that helps most

"What would you change?" A supplier who has built the same chair for ten years will tell you the joint detail that will fail at the specified seat height.

Ask it in the RFQ, not after the sample. The full checklist is in the specifying guide, and the production sequence is in the lead-time guide.