Qinghe.
EN
Home / Blog / Specifying / 24 Nov 2026

What Goes in a Sample Approval Record

A signature on a photo is not a record. Six items make one that still works in year three.

Part of the specifying guide — Specifying Seating Without Guesswork

The six items

Photographs from four angles. Dimensions measured on the sample. Cover roll number. Finish batch. Joint detail photographs. The signed date and the name of whoever signed.

Six items, one file, and the file is what a reorder is checked against.

Why photographs are not enough

The photograph does not carry a dimension or a roll number, and colour under a phone light is not colour. It supplements the record; it does not replace it.

The dimension sheet is the part that matters. Measure the sample yourself rather than trusting the drawing.

Where the sample lives

One piece stays at the factory as the reference, one goes to the project. The factory copy is what every later batch is checked against.

If a supplier will not keep the sample, they are not planning to match it.

The trick that costs nothing

Write the revision number on the sample with a permanent marker, under the seat. It takes ten seconds and settles every later question about which version was approved.

More on the reorder side in from sample to reorder; the approval sequence is in the specifying guide.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →