A terrace opens with a permit, a wind load and a storage plan. Furniture ordered without the first two is furniture that gets moved.

Part of the opening guide — Furniture for a Hotel Restaurant, in the Right Order

Permits before furniture

Pavement licences, fire escape widths and accessible routes. The terrace plan that encroaches on an escape route gets refused after the furniture is bought.

Then the structure: an awning, a wind break, or nothing. Each changes what the furniture has to survive.

Wind and weight

Exposed terraces lift light tables. The 700 mm round needs a base over 10 kg, or it has to come in at night.

Parasols are the other wind item: a 3 m parasol with a 25 kg base still moves in a gust, and it takes the table with it.

Weather storage

Cushions, covers and loose items need a store within 30 m, or they end up in a corridor. Then a nightly routine that is realistic for the closing team.

The terrace that takes 40 minutes to close will be closed badly.

Opening day

Set the terrace last, after the indoor room, because it is the part most likely to change. Then photograph the layout for the licence file.

Outdoor furniture sits in terrace and outdoor seating, and tables in terrace tables and chairs.