The room was built to the drawing and then changed four times. Without as-builts, the next order is measured from memory.
Final dimensions of every fixed item, the model numbers actually delivered, and the finish references as installed. Three sets of information, one file per room.
Then the deviations: the banquette that was cut 80 mm short, the table that shipped at 720–740 mm instead of 750 mm.
Whoever installs, with a checklist. Photographs of each item in place with a tape measure in frame. That is the fastest as-built record and it takes a morning per room.
Drawings come later, from the photographs and the packing list.
Re-ordering. Room that needs 12 more chairs in year three needs the same model, the same finish batch if possible, and the same seat height. Without a record, that is a sample round trip.
Then maintenance. Banquette bracket detail that exists only in one installer's memory is a bracket that gets re-invented badly.
One folder: as-built dimensions, model list, finish references, spares index, cleaning instructions, and the warranty terms. Six documents that answer 90% of the questions the hotel will have for the next five years.
Handover documentation sits in the specifying guide, and the delivery records in handover inspection of frames.