Per-seat cost is the only budget number that survives a plan change. It also exposes which items are eating the money.
Per cover, a hotel dining room lands at a chair, a share of a table, and a share of the fixed seating. Chairs are 45–55% of the furniture spend, tables 25–30%, banquettes the rest.
So a chair decision moves the budget more than any other single item, and a 15% chair saving is a 7% total saving — not the 15% the buyer expects.
Cover, frame and finish, in that order. 20–30% of FOB for upholstery against 35–45% of FOB for the frame. Moving from a standard contract fabric to a heavy performance weave can add 20% to the chair price on its own.
Species is the third lever. Beech to oak on a full frame is roughly 15% of chair cost.
Banquettes. Nobody costs the fixed seating properly at concept stage, and a 3 m upholstered run with a shaped back costs more than six chairs. On a room with 40 m of banquette, that is the line that breaks the budget.
Spares and freight, both usually forgotten, add 5–8%.
Set a per-cover budget, then allocate: chair, table, fixed seating, spares, freight. Any single item over its share needs a decision, not a rounding.
Cost structure detail sits in the factory guide, and quantity planning in quantity by room type.
Send the floor plan and the seat count. Quote and finish chip in one reply.
Start a conversation →