A terrace that opens in May and closes in October means two moves a year, and the second one is where the damage happens.
Clean before storing, not after. Dirt that goes into storage becomes a stain by spring.
Then dry storage with airflow, stacked on pallets, with covers off the floor. The container crossing the tropics can push 8% timber to 13% and back; starting at 8–10% leaves room for the round trip.
Legs broken in handling, covers creased by stacking, and frames twisted by uneven stacks. All three are storage practice, not material quality.
Then the spring move reveals them, when there is no time to repair before opening.
Count on the way out and on the way in, against the asset register. The count difference found in October is a claim; found in May it is a shortage.
Then photograph the store at closing, so the condition is documented.
Two days per move for a 100-cover terrace. Book them in the calendar and brief the team, because an unplanned move is a rushed move.
Storage practice sits in storage on site before install, and outdoor furniture in terrace and outdoor seating.
Send the floor plan and the seat count. Quote and finish chip in one reply.
Start a conversation →