Installation day snags are easy. The argument starts when something fails six months later and everybody has a theory.
Three categories: manufacturing, installation, and use. Loose leg is installation until you find the tenon was 4 mm short. Creaking joint is manufacturing unless the chair was dragged across a threshold.
Sorting by cause at the inspection means the right party pays and the fix is the right fix.
Date, carton number, model, a photograph with scale, and what the chair was doing when it failed. Five items. Without the carton number, a claim cannot be traced to a batch.
Batch tracing is why the carton label matters more than the chair label.
Most contracts give 30 days after delivery to raise defects. After that, it is a warranty question, which is a harder test.
So inspect properly in the first month, in writing, even if the answer is "no defects". Dated record with no findings protects both sides later.
When the same defect appears on more than 5% of a batch, stop repairing individually and treat it as a batch problem. Repairing 30 chairs one at a time costs more than replacing the batch and does not fix the cause.
Inspection procedure sits in handover inspection of frames, and the records in the specifying guide.