The First Week: Five Checks Before Service Settles

Furniture behaves differently after a week of service. Five checks in seven days catch what a handover inspection cannot.

Part of the opening guide — Furniture for a Hotel Restaurant, in the Right Order

The five

Glides and floor marks. Joint noise on the chairs nearest the door. Cover tension on the seats that get used most. Table stability after a week of being leaned on. And the banquette fixings.

Each takes twenty minutes and each catches a problem while the supplier still cares.

Why a week

Foam compresses, covers relax, joints seat. The chair that was silent on delivery may creak after 300 covers, and that is the chair to check.

35–45 kg/m³ for seat pads, 25–30 kg/m³ for backs — a pad that loses 5 mm in the first week is normal; one that loses 15 is not.

Who walks it

Housekeeping and the maintenance supervisor together. Housekeeping finds the cleaning problems, maintenance finds the loose ones.

Then one list, dated, sent to the supplier with photographs.

What to do with the list

Split into warranty items and site items. The loose glide is a site item; a joint that has opened is a warranty item.

Getting that split right at week one is what makes month nine easier. Snag process sits in punch list week, and claims in snag list and defects liability.