Qinghe.
EN
Home / Blog / Factory / 26 Nov 2026

AQL 2.5 on 200 Chairs: The Sample Size Nobody Counts

The report says 32 pieces were checked out of 200. One buyer reads that as generous coverage, another as too few to prove anything. Both miss what the number is for.

Part of the factory guide — Inside a Chair Workshop in Lecong

Where the sample size comes from

Three tables in ISO 2859-1 turn a lot size into an inspection plan, and none of them looks at the order value. Order 151 to 280 pieces and the lot maps to code letter G. Letter G maps to a sample of 32. Read at AQL 2.5, those 32 pieces allow two defects and reject the lot at three.

Run the same chair at 400 pieces and the letter moves to H, the sample to 50, and the acceptance number to three. The plan is designed to hold confidence per lot, not to open a fixed share of the boxes.

Three numbers, not one

One AQL for a whole chair order is a shortcut that costs somebody money later. Split the schedule into critical at 0, major at 2.5 and minor at 4.0. Broken tenon, staple through a seat rail or a screw visible on a back post is critical, and critical allows none in 32, so one finding stops the container.

Major covers what a guest can see: a joint gap over 0.3 mm, a stitch line 5 mm off the seam, powder blistering on a leg. Minor covers what the inspector finds at 600 mm under a lamp. Written as three lines, the same inspection separates rework from scrap.

What two defects say about the other 168

Acceptance at two does not mean two chairs are bad. Two defects in a sample of 32 put the lot at roughly 6 per cent defective, which is 12 chairs out of 200. Acceptance is a statement about the lot, and the number to plan with is the 12.

That is where the spares figure comes from. Two per cent spare has no basis in the sampling plan, and 6 per cent matches what an accepted lot can still hold. Room-by-room ratios are in spare chair counts.

What a rejection costs

Rejection at three means a 100 per cent sort of the lot. At 12 minutes per chair, 200 chairs is 40 hours, a full week for one inspector, before rework is counted. Rework on a rejected lot usually runs 4 to 9 per cent of the order, because the sort finds more than the 32 did.

The cheaper route is to settle this at quotation: who pays for the sort, what the defect classes are, and what the acceptance number is. None of it costs anything to agree in writing.

Five lines on the purchase order

Standard and revision, inspection level, AQL per defect class, where the sample is drawn (five pallets, not the top layer of one), and the consequence of rejection. Those five lines are what an inspection agency quotes against, and they are also what stops a supplier choosing the AQL after the batch is packed.

The stations that catch defects before sampling does are covered in QC stations. The final check is set out in pre-shipment inspection, the first-off check in first article inspection, and the sampling rules in the factory guide. Chairs that pass a 200-piece lot are listed under hotel dining chairs.

Where this applies

More from the workshop

Have a room to fit out?

Send the floor plan and the seat count. Quote and finish chip in one reply.

Start a conversation →