The date is fixed and the last container is three weeks out. Opening short is survivable if the shortfall is planned.
Better to open with 80% of the covers in one zone than 100% of the chairs with no tables. Prioritise complete zones over complete models.
Then close the incomplete zone properly — a screen, a plant, a sign. The half-set area reads as unfinished; a closed area reads as deliberate.
Hire matching chairs for the shortfall if the model is available, or use the banquet stock. Mismatched hire furniture in a new room is visible, so keep it to the back zone.
Borrowing from another room works if the seat height and finish match.
Nothing, if the room reads finished. Everything, if it does not. The service recovery conversation about a chair is worse than a closed zone.
Brief the front desk on which zone is closed and why, so the answer is consistent.
Install it in a closed period, not during service. Two hours with the room empty beats a whole day of apologising.
Then check seat heights against the existing stock, because a later batch can differ by 5 mm and that shows.
Phasing detail sits in phasing a furniture order, and the install plan in installation labour planning.