Qinghe.
EN

Notes From the Workshop

What we have learned cutting frames, bending backs and packing containers for hotel and buffet rooms.

24 Nov 2026·Construction
Steel or Timber Frame: Where the Money Actually Goes
Steel looks cheaper on the tube price and often is not, once coating, welding and packing are counted. The split depends on the shape.
24 Nov 2026·Construction
Steel or Timber in Service: Ten Years of Difference
Both survive a decade. They fail in different places, at different times, and one of them can be repaired in the room.
24 Nov 2026·Construction
Matching Metal and Timber on the Same Chair
A steel frame with oak arms is two finishes pretending to be one product. They read as a pair or as a mistake, and the difference is warmth.
24 Nov 2026·Construction
Chairs on Carpet: Glides, Sinking and the Seat Height Nobody Recalculates
A thick carpet costs 15 mm of seat height. Nobody adjusts the table, and then the chairs feel wrong for reasons the guest cannot name.
24 Nov 2026·Specifying
The Chair Schedule a Supplier Can Actually Price
Most schedules are a photograph and a quantity. That gets you a price for a chair, not for your chair, and the difference appears at handover.
24 Nov 2026·Specifying
Writing Tolerances Into a Furniture Specification
Without a number, 'the same as the sample' means whatever the inspector decides on the day. Four tolerances cover most disputes.
24 Nov 2026·Specifying
Room Plan Details the Factory Needs Before Cutting
A floor plan shows where furniture goes. It rarely shows the four things that change the drawing: walls, floors, doors and ceiling height.
24 Nov 2026·Specifying
The Mock-Up Room: One Room That Saves a Whole Order
Fitting one room before the full order costs about 2% of the contract and answers every question a sample chair cannot.
24 Nov 2026·Specifying
Phasing an Order Without Paying Twice
Six hundred chairs in three deliveries sounds efficient. It usually means three setups, three freight bookings and three colour batches.
24 Nov 2026·Specifying
Budget Per Seat: What a Dining Room Actually Costs
Per-seat cost is the only budget number that survives a plan change. It also exposes which items are eating the money.
24 Nov 2026·Specifying
Value Engineering a Chair Without Losing the Spec
When the number comes in 20% over, somebody proposes a cheaper cover. There are five better places to take it out first.
24 Nov 2026·Specifying
One Supplier or Three: The Hidden Cost of Splitting an Order
Splitting an order across three factories looks like risk management. It is also three colour references that will never match.