A partial handover means delivering into a building with other trades in it. That is a protection problem before it is a logistics one.
Floor protection along the whole route, corner guards on door frames, and a covered lift. Ten minutes of laying protection saves a floor claim.
Then a written route agreement with the main contractor, because the route changes when another trade needs it.
The lockable room for cartons, dry, with the door wide enough for a pallet. Chairs staged there and moved to the room in the final week, not stored in the room while other trades work.
The container crossing the tropics can push 8% timber to 13% and back; starting at 8–10% leaves room for the round trip. The wet building is a humid store.
The nominated receiver with authority, present for every delivery. Not a subcontractor who leaves at four.
Count and photograph before signing, and record any damaged carton with the label in frame.
When the room is not weathertight, or the floor is not finished and the furniture would have to be moved twice. Refusing costs a re-delivery; accepting costs a claim.
Delivery checks sit in delivery day checklist, and storage in storage on site before install.