Cartons labelled by model and piled in a corridor turn a one-day install into three. Staging by zone fixes it before the truck arrives.
The installer needs one room's worth of chairs. If the cartons are sorted by model, that means opening five piles and rebuilding one.
Sorted by room, one pile is one room. The difference is roughly three times the labour.
The floor plan with each carton group marked, and the carton labels carrying the zone name. Then a staging area big enough to lay the groups out separately.
Label the zones with tape on the floor. Installers read floors, not lists.
Stage in the corridor in zone order, nearest the room to the door. Then move one group at a time.
Or stage in a nearby empty room and work outwards. Both need a plan; neither works by improvisation.
Room-block packing is a factory decision. Ask for it at order stage, because repacking on site costs a day and some cartons.
Packing by room sits in room block packing, and install labour in installation labour planning.