A finished sample chair is three weeks of a fitter's time and a cover roll. Suppliers who give them away are charging for them somewhere.
7–10 days for a frame sample, 12–15 with cover and finish. Behind that: cutting, machining, a frame assembly, upholstery, finishing, and a courier. On a bespoke chair, that is 3–5% of the unit price multiplied by the number of revisions.
Three revisions and the supplier has spent more on samples than the order will return in margin. That is why free samples come back as a higher unit price.
Client pays for the sample, supplier credits it against the order. That structure keeps both sides honest: the client does not order twelve samples for fun, and the supplier does not cut corners on them.
For a repeat order, the sample should be free — the tooling already exists.
Two revisions included, then charged at cost. Written into the quotation. Without it, "one more tweak" runs for months and the delivery date moves with it.
Every revision restarts the approval clock, which is the part clients underestimate.
The production frame on production tooling, the production cover, and the production finish. Sample made in the sample room by hand tells you what the factory can do when it tries, not what it will deliver.
Sample scheduling sits in sampling timeline, and the approval record in sample approval record.